Greater Khingan Mountains, Heilongjiang Province
Classification:
Project address: Greater Khingan Mountains, Heilongjiang Province
Project date: March 2022
End hole caliber: PQ(123mm)
End hole depth:200m
Project features: The construction method of drilling instead of trough exploration, reduce the excavation area and reduce labor costs.
Project results: The construction team adopts ROCK-800 portable drilling rig, which can enter the site quickly without building roads. The installation method is flexible and convenient, which minimizes the damage to ground vegetation.
Key words:
Knock, Drilling

Hotline:
Detailed introduction
Graphic Details
Product Consulting
Contact Us
Room 1106, 123 Caoshi Street, Chengdu City, Sichuan Province
Products

WeChat Public Number
Copyright©Sichuan Nock Drilling Machinery Co., Ltd.
Website:300.cn
SAF Coolest v1.3.1.2 设置面板 UVISD-ZYAB-AXADE-ZFQ
图片ALT信息: NOCK
违禁词: First, best, first-class, leading, unique, king, leader, leader, extreme,
无数据提示
Sorry, the current column is being updated, please look forward to it!
You can view other columns or returnHome Page