Guizhou Zhenfeng Fluorite Mine Project

Classification:


Project address: Zhenfeng, Guizhou Project date: August 2022 End hole caliber:NTW(75mm) End hole depth:1008.2m Project results: The construction team used ROCK-1000 portable drilling rig, and reached the construction period of 28 days with NTW diameter of 1008.2 meters under the condition of running only 3 engines. It is a model of efficient drilling construction.

Key words:

Knock, Drilling