Guizhou Zijin Project

Classification:


Project address: Guizhou Project date: July 2022 End hole caliber: BTW(60mm) End hole depth:390 m Project features: Steep hillside construction, no water source and road Project results: The construction team used ROCK-300 drilling rig to build the machine on the mountainside with no water source on the mountain; Water is transported down the hill by vehicle and supplied by pu mping stations. The construction period is 6 days (including the time of handling and installation). The final hole diameter is BTW and t the depth is 390 meters, which is beyond the design depth of conventional shallow hole drill.

Key words:

Knock, Drilling

Hotline:

Detailed introduction

Graphic Details


Product Consulting


SAF Coolest v1.3.1.2 设置面板UVISD-ZYAB-AXADE-ZFQ

图片ALT信息: NOCK
违禁词: First, best, first-class, leading, unique, king, leader, leader, extreme,

无数据提示

Sorry, the current column is being updated, please look forward to it!

You can view other columns or returnHome Page

V1.3.1 SVG图标库请自行添加图标,用div包起来,并命名使用