Sichuan Ganzi Jiulong Lead-Zinc Mine Project

Sichuan NOCK used three drilling RIGS to complete the task of 5000 meters in 22 days in the broken stratum at an altitude of 3200meters. The final hole diameter was NTW.The highest single daily footage is 180 m.

Honghe Prefecture,Yunnan Province

Project Location: Honghe Prefecture, Yunnan Province Project date: July 2022 End hole caliber:HTW (91mm) End hole depth:100m Project features: This project is aimed at the dam surrounding drilling exploration, through water injection and water pressure test, understand the geological conditions of the dam. Project results: The geological exploration team adopted ROCK-300 portable fully hydraulic drilling rig, which is suitable for construction in specific and complex geographical environment,convenient, fast, safe and efficient installation, successfully completed the exploration, and won high recognition from the construction team.

Gold exploration in Abuja, Cote d'Ivoire, West Africa

In the Abuja gold exploration in Cote d 'Ivoire, West Africa, Tito successfully completed the 2021 drilling mission with six Nock portable drilling RIGS and achieved outstanding results: The annual total of 110,696 meters; The average monthly footage of a single drill is 2000 meters/month; The highest single monthly footage 2620.5 meters; The highest single class (12 hours) carries 108 meters. Total exploration costs are less than $25 / m.

Motuo,Xizang

Project location: Motuo, Xizang Project date: April 2022 End hole caliber:NTW(91mm) End hole depth:1050m Project results: The design hole of this project is 1000 meters deep. The stratum is broken, granite, gneiss intermixed broken layer. The project used Sichuan ROCK-1300 portable full hydraulic drilling rig, which lasted 56 days, finished the hole with a diameter of 75mm and 1050meters successfully. The torque of the final hole was normal, the power was sufficient, and the core removal rate reached more than 98%.It meets the requirements of geological exploration.

Fuyun County, Xinjiang Province

Project Address:Fuyun County, Xinjiang Province Project Date: October 2021 Final hole caliber: NTW(75mm) Final hole depth: 939 m Project features:underground construction, large dust, tunnel damp Project results: The construction side uses ROCK-1000E electric drill rig, using Siemens motor power system, to ensure the safety of the hole without accidents.The final hole diameter is NTW(75mm), and the final hole depth is 939 meters.

Guizhou Zijin Project

Project address: Guizhou Project date: July 2022 End hole caliber: BTW(60mm) End hole depth:390 m Project features: Steep hillside construction, no water source and road Project results: The construction team used ROCK-300 drilling rig to build the machine on the mountainside with no water source on the mountain; Water is transported down the hill by vehicle and supplied by pu mping stations. The construction period is 6 days (including the time of handling and installation). The final hole diameter is BTW and t the depth is 390 meters, which is beyond the design depth of conventional shallow hole drill.

Guizhou Zhenfeng Fluorite Mine Project

Project address: Zhenfeng, Guizhou Project date: August 2022 End hole caliber:NTW(75mm) End hole depth:1008.2m Project results: The construction team used ROCK-1000 portable drilling rig, and reached the construction period of 28 days with NTW diameter of 1008.2 meters under the condition of running only 3 engines. It is a model of efficient drilling construction.
< 1...345...9 > proceed page

SAF Coolest v1.3.1.2 设置面板UVISD-ZYAB-AXADE-ZFQ

图片ALT信息: NOCK
违禁词: First, best, first-class, leading, unique, king, leader, leader, extreme,

无数据提示

Sorry, the current column is being updated, please look forward to it!

You can view other columns or returnHome Page

V1.3.1 SVG图标库请自行添加图标,用div包起来,并命名使用